https://a-ap.storyblok.com/f/3000279/0x0/07b446b806/steamatic-logo-banner.svg
Call 24/7
1300 783 262

In a race against time, Steamatic Canberra undertook a monumental task: restoring a prominent school in Isabella Plains before the start of term. Facing extensive flood damage and a tight deadline, our team orchestrated a remarkable feat of restoration, ensuring the campus was fully operational for the return of students.

The Challenge

A large portion of the school was submerged, and term start was looming, the challenge was clear: execute a comprehensive restoration swiftly and seamlessly. The pressure was on to ensure minimal disruption to the school's academic calendar.

The Solution

Steamatic Canberra approached the task with unwavering determination and a meticulously crafted plan. Recognising the urgency of the situation, we mapped out a strategic timeline, leaving no room for delays. Every aspect of the restoration process was carefully coordinated to maximise efficiency and minimise downtime.

Implementation: Armed with over 200 air movers and industrial-sized desiccant dehumidifiers, Steamatic Canberra sprang into action. Our team worked tirelessly, methodically drying out every inch of the flooded campus. We restored classrooms, corridors, and common areas to their pre-loss condition with precision and expertise, ensuring a safe and welcoming environment for students and staff.

Next case study on Flood Restoration