A prominent builder engaged Steamatic Melbourne to support the remediation efforts on a well-known heritage-listed building in North Melbourne after the discovery of mould. The building, renowned for its exquisite ornate ceilings and heritage timber throughout, required careful and precise work to preserve its historical integrity while ensuring the mould was thoroughly and safely removed.
The Challenges
The project presented several significant challenges:
Preserving Heritage Features: The building's ornate ceilings and heritage timber elements needed to be preserved and protected during the mould removal process.
Containing Mould Spores: Preventing the spread of mould spores to other parts of the building was crucial to avoid further contamination.
Working at Height: The tall ceilings required safe scaffolding and adherence to strict working-at-height safety standards.
Collaboration with Multiple Stakeholders: Coordination between our team, the builder, and the building owner was essential to ensure seamless workflow and preservation of the building's historical value.
The Solution
To address these challenges, our team implemented a comprehensive and meticulous remediation plan:
Enclosed Chamber for Containment: We prepared an enclosed chamber to contain mould spores, preventing them from spreading to other areas of the building.
Scaffolding Installation: Scaffolding was erected inside the building to provide safe access to the tall ceilings, meeting all working-at-height safety standards.
Meticulous Mould Removal: Mould was carefully removed from the timber ceilings using wire brush techniques. HEPA filters were employed to capture mould spores from the air, ensuring a clean and safe environment. Timber joints and bearers were also cleaned thoroughly before being reinstalled.
Condition 2 Cleaning: Following the mould removal, we performed a condition 2 cleaning to preserve the structural integrity and historical features of the building.
Roof Cavity Remediation: In the roof cavity, additional mould caused by old ducting was discovered. We removed the ducting and collaborated with the builder to replace it.
The Outcome
The project was a resounding success, resulting in several positive outcomes:
Effective Mould Remediation: The mould was effectively and safely removed from the building, preventing any further contamination.
Preservation of Heritage Features: The building's ornate ceilings and heritage timber were meticulously preserved, maintaining its historical integrity.
Improved Building Health: The removal of old ducting and thorough cleaning of timber joints and bearers improved the overall health and longevity of the building.
Seamless Collaboration: The strong collaboration between our team, the builder, and the building owner ensured a smooth workflow and successful project completion.
Pride in Restoration: The successful restoration of this beautiful heritage-listed building is a testament to the dedication and expertise of all parties involved, something we are all immensely proud of.
This project showcases our commitment to delivering high-quality, detailed-oriented mould remediation services while preserving the historical value of heritage buildings.